Retail fit-out
- General retail
- £400 to £800 per m²
- Food retail
- £600 to £1,200 per m²
- Typical programme
- 3 to 10 weeks
A retail fit-out is measured against one date: opening day. Every week a shop is closed costs sales, so retail contractors are used to compressed programmes, night working in centres, and handing over a store merchandised and ready to trade.
Costs depend far more on the type of store than on its size.
Typical retail scopes
- New store in a shell unit
- Services, floor, ceiling, lighting, fitting rooms, stockroom, staff areas and shopfront, from a bare unit in a centre or high street.
- Refit of a trading store
- New layout, fixtures and lighting, often done overnight or in a short closure to keep the shop trading.
- Roll-out across a portfolio
- The same design repeated in many stores, priced per store, with a standard programme and kit of parts.
- Shopfront and signage
- New glazing, entrance doors and fascia, usually needing planning permission and advertisement consent.
Schedule of rates, retail
| Item | Scope | Guide cost |
|---|---|---|
| Fashion or general retail | Floor, ceiling, lighting, fixtures and fitting rooms | £400 to £800 per m² |
| Food retail | Includes more services, refrigeration builders' work | £600 to £1,200 per m² |
| High-end boutique | Bespoke joinery, stone, feature lighting | £1,500 to £3,000 per m² |
| Food-to-go unit, excluding equipment | Basic counter fit-out | £700 to £1,000 per m² |
National trades pricing guide, typical 2026 UK prices (June 2026), VAT not stated. Shopfitting joinery and refrigeration equipment are often priced separately. A guide, not a quote. Build a budget in the cost plan.
Planning a retail fit-out
The landlord's fit-out guide
Shopping centres and retail parks publish a tenant fit-out guide with rules on working hours, deliveries, hot works, fire alarm connections and the approvals they need before work starts. Read it before pricing; it changes what the job costs. Many centres allow noisy work only before opening or after closing.
Consents
Internal fit-out of a shop rarely needs planning permission, but a new shopfront usually does, and illuminated signs need advertisement consent. Change of use between retail, café and services is now much simpler in England because many sit in the same use class (Class E) since 2020, though that does not remove building regulations or the landlord's consent.
Fire safety and access
New layouts must keep escape routes, fire separation to stockrooms and emergency lighting working, and the responsible person for the premises must review the fire risk assessment under the Fire Safety Order before trading. Entrances and counters must be usable by disabled customers.
Programme to opening
Work back from opening day: merchandising and staff training need the last few days, so practical completion comes earlier. Long-lead items such as shopfront glazing, refrigeration and bespoke fixtures should be ordered as soon as the design is fixed.
Where our information comes from
- The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020
- The Regulatory Reform (Fire Safety) Order 2005, legislation.gov.uk
- GOV.UK, Approved Document B: fire safety
- HSE, CDM 2015: commercial clients, roles and responsibilities
Cost ranges are typical figures from published UK cost guides and price guides, read November 2026, given before VAT. Firms that publish them are not named.
Unit size, the centre or street and your opening date: that is a retail brief.
Brief a contractorHow the work gets done
How a typical new store fit-out runs.
Survey and design
Measured survey of the unit, store layout, landlord fit-out guide checked, consents applied for.
Approvals and orders
Landlord approval of drawings, fixed price agreed, long-lead fixtures and shopfront ordered.
Fit-out
Services, floor and ceiling, shopfront, fixtures and fitting rooms, often on nights in a trading centre.
Handover and open
Snagging, fire alarm tie-in, cleaning, then merchandising and staff in before opening day.
Retail fit-out questions
How much does a shop fit-out cost per m²?
How long does a retail fit-out take?
Can the shop keep trading during a refit?
Do we need planning permission?
What is a shell and core unit?
Keep reading
- Restaurant fit-out
Kitchens, extraction and food hygiene.
- CDM 2015 client duties
They apply to every store fit-out.
- M&E services
Lighting, cooling and power.
- Dilapidations works
Handing a unit back at lease end.
Brief a retail fit-out contractor
Three short steps: where the building is, what the scope is, and who to speak to. Rough answers are fine; a contractor firms them up on a site visit.
Your brief stays with us until you approve the independent commercial refurbishment contractor we name for your building.
Received. This is what happens next.
- We find an independent commercial refurbishment contractor working in your part of the country on projects of this scale and sector, and contact you with the firm's name.
- Nothing goes to them until you say yes.
- Once you approve, the firm books a visit and follows up with a written proposal. You won't hear from us again unless you ask.