Guide cost, central London
£160 to £4,100 per m²
Typical programme
6 to 28 weeks
Prices
Excluding VAT and fees

An office refurbishment can be anything from new carpet and lighting over a long weekend to stripping a floor back to its slab and rebuilding it for a new way of working. The price per square metre moves by a factor of ten across that range, so the first job is to name the scope.

This page sets out the four scopes most offices are bought in, what each costs per m² of net internal area, how long the work takes, and what you are legally responsible for as the client.

Brief a contractor

Which scope you are buying

Light refresh
Decoration, carpet tiles, LED panel swaps and small repairs. The layout, ceilings and plant stay. Often done floor by floor while the building stays open.
Cat A
The landlord standard: suspended ceilings, raised floor, lighting, heating and cooling to an open floor, finished toilets and core. Done before a letting or when systems reach the end of their life.
Cat B
The occupier layer on top of Cat A: meeting rooms, kitchens, breakout space, finishes, branding and the services moved to suit. Done for a new lease or a change in how people work.
Full refurbishment
Strip to shell and rebuild, usually with new M&E plant, sometimes a new reception or facade. The building is normally empty for the duration.

Schedule of rates, office scopes

ItemScopeGuide cost
Light refreshDecoration, carpet tiles, LED lighting swaps, no change to layout or plant£160 to £320 per m²
Cat A fit-outCeilings, raised floor, lighting, heating and cooling to open plan, toilets and core finishes£650 to £1,020 per m²
Cat B fit-out, standardPartitions, meeting rooms, tea points, finishes and services moved to suit the layout£1,300 to £2,150 per m²
Cat B fit-out, premiumHigher-end joinery, glazing, acoustic treatment, hospitality areas£2,350 to £4,100 per m²
Cat A and Cat B togetherShell to working office in one contract, low to high specification£1,600 to £3,900 per m²

Central London rates per m² of net internal area. Regional work is typically 10 to 30% lower: see the cost plan for each region. A guide, not a quote. Build a budget in the cost plan.

Planning an office refurbishment

Start from the brief, not the drawings

The most expensive refurbishments are the ones that change scope halfway. Before any designer or contractor is appointed, write down how many people the space must hold, how many of them will be in on a busy day, which rooms you need (meeting rooms by size, quiet rooms, a kitchen, storage, comms room) and the date you must be in. The British Council for Offices recommends designing speculative offices for about 10 m² per person, with 8 m² treated as an exception for unusually dense use. A 1,000 m² floor therefore suits around 100 workstations before you start carving out meeting space.

Check what the lease lets you do

Most commercial leases need the landlord's written consent for alterations, often through a licence for alterations with drawings attached. Some landlords insist on their own approved contractors for work touching the base building, such as sprinklers, fire alarm and the air conditioning. Ask early: a licence can take six to ten weeks, and it often sets what you must strip out when you leave.

Survey before you price

Any building built before 2000 may contain asbestos. Before refurbishment work disturbs the fabric, the law expects a refurbishment and demolition survey of the areas affected, which is more intrusive than the management survey the building may already have. HSE's survey guide, HSG264, sets out how it is done. Findings change both the price and the programme, so commission it before going to tender rather than after.

Building regulations and energy

New partitions, moved fire doors, new escape routes and changes to lighting and air conditioning are all building work. A contractor will normally notify building control. Where the work renovates a large part of a building, Approved Document L can require reasonable upgrades to energy performance. If you are a landlord, the minimum energy efficiency standard means a let commercial building in England and Wales currently needs an EPC of E or better, and a refurbishment is the cheapest moment to improve the rating.

How the work is bought

Smaller jobs are usually priced as a lump sum against a specification under a minor works contract. Larger ones go either "traditional" (your designer completes the design, contractors price it) or "design and build" (the contractor develops the design and carries that risk). Public sector buyers often use frameworks. For a sense of scale, recent public awards include £1,581,300 to refurbish a single government office floor over about 25 weeks and £1,274,705 for office areas on a science campus over about 23 weeks.

Where our information comes from

Cost ranges are typical figures from published UK cost guides and price guides, read November 2026, given before VAT. Firms that publish them are not named.

A one-page brief and a floor area are enough to start a conversation with a contractor.

Brief a contractor

How the work gets done

The order most office refurbishments follow, from brief to handover.

  1. Brief and survey

    Headcount, rooms, dates and budget agreed. Measured survey, asbestos survey for the affected areas, and a check of the lease.

  2. Design and price

    Layouts and a specification, landlord consent, and lump-sum prices from contractors against the same scope.

  3. Works on site

    Strip-out, first fix services, partitions and ceilings, second fix, finishes. Weekly progress meetings and a programme you can hold them to.

  4. Handover

    Snagging, commissioning of heating, cooling and fire alarm, building control completion, as-built drawings and the health and safety file.

Office refurbishment questions

How much does an office refurbishment cost per m²?

In central London, published guides put a light refresh at £160 to £320 per m², Cat A at £650 to £1,020 per m² and a standard Cat B at £1,300 to £2,150 per m², all before VAT and fees. Outside London expect 10 to 30% less. See the office refurbishment cost plan for a budget by area and region.

How long does an office refurbishment take?

A light refresh of one floor can be done in one to three weeks, often out of hours. A Cat B fit-out of 1,000 m² typically takes 8 to 14 weeks on site, plus 6 to 12 weeks of design and pricing before it. Recent public office refurbishments of a single floor ran for about 23 to 28 weeks on site.

Can we stay in the building during the work?

Often, if the work is phased floor by floor or done out of hours. It adds cost (temporary partitions, dust control, moving people twice) and time. Noisy strip-out is usually done at night or weekends in occupied buildings.

Do we need planning permission?

Internal work to an office rarely needs planning permission. External changes such as new shopfronts, signage, plant on the roof or a new entrance usually do, and listed buildings need listed building consent for internal alterations too. Building regulations apply either way.

Who is responsible for health and safety?

Responsibility is shared: the CDM Regulations 2015 give the client its own duties alongside those of the contractor. Where two or more contractors will be involved, the client has to name a principal designer and a principal contractor, and do so in writing. Our CDM 2015 client duties page sets out what that means in practice.

Does the price include furniture?

Usually not. Fit-out prices exclude loose furniture and IT. Budget £1,500 to £5,000 per workstation for furniture, depending on the range.

Keep reading

Brief a contractor on your office

Three short steps: where the building is, what the scope is, and who to speak to. Rough answers are fine; a contractor firms them up on a site visit.

Your brief stays with us until you approve the independent commercial refurbishment contractor we name for your building.

Step 1 of 3

Where is the building?
Brief a contractor