Commercial Refurbishment Contractors
Office, retail, education and healthcare refurbishment, scoped the way a tender pack is: package by sector, with published costs per m² and real programme lengths.
We introduce you to an independent contractor for your area; nothing is shared until you agree.
Scope matrix Pick a package and a sector
Fit-out · Office: Cat B layout
Meeting rooms, kitchen and breakout, reception, finishes, AV, and services moved to match the layout.
- Guide cost
- £1,300 to £2,150 per m²
- Standard specification, central London
- Programme
- 8 to 14 weeks on site
What does the job involve?
Most commercial projects are bought as one or more of these packages, and each sector adds its own rules.
Packages
- AOffice refurbishmentRefresh, Cat A, Cat B or strip to shell: the four scopes compared.
- BCat A fit-outThe landlord standard that makes a floor lettable.
- CCat B fit-outRooms, kitchens and finishes for one occupier.
- DM&E servicesHeating, cooling, ventilation, lighting and fire systems.
- EDilapidations worksReinstatement and repair at the end of a lease.
- FCDM 2015 client dutiesWhat the client must do by law, on every job.
What commercial refurbishment costs
Guide rates per m² of floor, before VAT and professional fees, from published UK cost guides and public benchmarks read in November 2026. Central London for offices; the regions run 10 to 30% lower.
A guide, not a quote. A contractor prices your building after a site visit.
| Sector | Scope | Guide cost |
|---|---|---|
| Office | Light refresh | £160 to £320 per m² |
| Office | Cat A fit-out | £650 to £1,020 per m² |
| Office | Cat B fit-out, standard | £1,300 to £2,150 per m² |
| Office | Cat B fit-out, premium | £2,350 to £4,100 per m² |
| Retail | Fashion or general retail | £400 to £800 per m² |
| Retail | Food retail | £600 to £1,200 per m² |
| Hospitality | Restaurant or bar | £800 to £2,500 per m² |
| Education | School refurbishment, light to heavy | £2,256 to £4,575 per m² |
How long refurbishment takes
Seven recent public contracts on one scale: school holiday packages in six weeks, a single office floor in about six months, live hospital wards spread over longer.
- EducationClassroom refurbishment and new toilets at a special school in Cheshire6 weeks · Aug 2025 to Sep 2025
- EducationToilet refurbishment at a Liverpool primary school6 weeks · Jul 2025 to Aug 2025
- HealthcareA second ward refurbishment at the same trust19 weeks · Nov 2025 to Mar 2026
- OfficeRefurbishment of office areas on a science campus in Oxfordshire23 weeks · Jan 2026 to Jun 2026
- OfficeRefurbishment of one office floor for a central government property body25 weeks · Nov 2025 to May 2026
- OfficeRefurbishment of a university regional office in Edinburgh28 weeks · Nov 2025 to Jun 2026
- HealthcareWard refurbishment at an Essex NHS hospital trust30 weeks · Sep 2025 to Mar 2026
The client's side of the job
Whoever commissions the work carries legal duties a contractor cannot take away. These five come up on almost every commercial refurbishment.
- CDM Regulations 2015
- As the client, make suitable arrangements, appoint a principal designer and principal contractor in writing where more than one contractor works, and provide pre-construction information. More
- Control of Asbestos Regulations 2012
- Before refurbishment disturbs the fabric of a building built before 2000, have a refurbishment and demolition survey of the affected areas (HSE guide HSG264). More
- Building Regulations
- New layouts, fire doors, escape routes, lighting and cooling are building work. In England, clients also carry dutyholder and competence duties since October 2023. More
- Energy efficiency (MEES)
- A let commercial building in England and Wales needs an EPC of E or better unless an exemption is registered. Refurbishment is the cheapest time to improve it. More
- The lease
- Most alterations need the landlord's written consent, and most leases say what must be stripped out and reinstated when you leave. More
Where our information comes from
- HSE, CDM 2015: commercial clients, roles and responsibilities
- HSE, HSG264 Asbestos: the survey guide
- GOV.UK, Design and building work: meeting building requirements (dutyholders and competence)
- GOV.UK, Non-domestic private rented property: minimum energy efficiency standard, landlord guidance
- British Council for Offices, Guide to Specification (2023)
- Welsh Government, Sustainable Communities for Learning: cost standard benchmarks (July 2026)
How the job gets done
The same four stages whether it is one floor or a whole estate.
Brief and survey
Headcount, rooms, dates and budget agreed; measured, condition and asbestos surveys; the lease and consents checked.
Design and price
A specification or design and build brief, priced as a lump sum on the same scope so prices can be compared fairly.
Works on site
Strip-out, services, partitions and ceilings, finishes, under a construction phase plan and a programme you can hold the contractor to.
Handover
Snagging, commissioning, building control completion, O&M manuals and the health and safety file.
Send a brief and we name one independent contractor who covers your area; your details go to them only once you agree.
Office refurbishment by city
Questions people ask
What do commercial refurbishment contractors do?
How much does commercial refurbishment cost per m²?
What is the difference between refurbishment and fit-out?
How do we choose a commercial refurbishment contractor?
Can the building stay open during refurbishment?
Do you carry out the work?
Brief a contractor
Three short steps: where the building is, what the scope is, and who to speak to. Rough answers are fine; a contractor firms them up on a site visit.
Your brief stays with us until you approve the independent commercial refurbishment contractor we name for your building.
Received. This is what happens next.
- We find an independent commercial refurbishment contractor working in your part of the country on projects of this scale and sector, and contact you with the firm's name.
- Nothing goes to them until you say yes.
- Once you approve, the firm books a visit and follows up with a written proposal. You won't hear from us again unless you ask.